Cookie Preference Centre

We use cookies to enhance your website experience and help us identify any issues and areas for improvement. You can either "accept all" cookies or "manage preferences" to control the use of cookies. If you choose not to accept some cookies, please note you may experience a more limited functionality on our website. You can change your cookie preferences at any time.

Manage Cookie Preferences

A cookie is a small file containing just text, downloaded on to a device when a user accesses certain web sites. Cookies are useful because they allow a web site to recognise a user's device. Cookies allow us to store information related to your website visit which enables you to be shown relevant content to you while you’re browsing.

Cookies can also help us identify issues and improve the website, enhancing the experience for all users. We cannot identify individual users from these cookies. As well as the functionality below, you may be able to block the use of Cookies through your browser, please refer to our cookies policy for further information.

Longton Grange

A development of 4, 5 & 6-bedrooms homes

Reynard Close, Longton, Preston, PR4 5DD

Get directions

Key features

  • Now sold out
  • High-quality specification throughout
  • Flexible, open plan layouts
  • Designer kitchens with bi-fold doors and islands
  • Desirable village location
  • Rated 'Excellent' on Trustpilot

Longton Grange has now sold out

Don't worry if you missed out, visit our nearest development at Woodbridge Green, Lea.

New homes in Longton, Preston.

Featuring a collection of 4, 5 and 6-bedroom detached properties, our new homes in Longton are designed for modern living and built to last, offering more than your average new build.

Our new homes in Longton have been beautifully crafted and well-designed, being solidly built and full of character, with a high-quality specification that includes so much more than you’d expect. This means having a whole host of stunning features, including designer kitchens, bi-fold doors, waterfall showers, and fully turfed gardens with fences and paved patios, all as standard.

The exceptional exteriors of our new build homes incorporate a variation of bricks and render, making the street scenes unique and your house different from your neighbours’.

Speak to our Sales Executive today about our new homes in Longton.

External of new build houses at Longton Grange Story Homes development

A specification that’s anything but standard

Designed for modern living and built to last, our homes offer more than your average new build. Our high specification includes so many features to be proud of, like large open plan family areas that incorporate a stylish kitchen island, Porcelanosa bathroom tiles and French or bi-fold doors leading out to the garden.

Specification applies to a majority of plots and developments, please speak to your Sales Executive for further information.

Experience our specification

What’s around Longton Grange?

Situated in the desirable village of Longton, just a short walk to the centre and all it has to offer, this exclusive development is surrounded by green open space with excellent commuter links to Preston city centre and the M6 motorway.

Longton offers an array of cafés, restaurants, independent stores and supermarkets. Longton VM Sports & Social Club is just around the corner and hosts a range of events and activities for everybody to enjoy, including a weekly quiz and monthly cinema screenings. This quaint village is the perfect place to call home.

Our new homes in Longton also benefit from being within minutes of a good selection of primary and secondary schools, with Longton Primary School, which is just a short walk away and rated ‘Outstanding’ by Ofsted. For lovers of the outdoors, Brickcroft Nature Reserve, Ribble Way and Longton Marsh are all within walking distance, providing the perfect opportunity for a walk or a picnic.

Longton Grange is a short drive from Penwortham, a popular suburb of Preston with a vibrant atmosphere and home to a number of stylish bars, contemporary restaurants and independent shops. Preston city centre is also just 5 miles away, where you will find an abundance of high street branded stores, restaurants and bars, as well as the University of Central Lancashire. For those wanting to travel further afield, Preston Train Station provides links to major cities such as Liverpool, London and Manchester Airport.

If you’d like to hear more about our new homes in Longton, please don’t hesitate to get in touch.

Ribble Way
Brickcroft Nature Reserve
Preston Town Hall

Nearby Developments

Site plan

BAY BAY BAY BLD BLD MDN MDN MDN MDN MDN MDN MDN MTN MTN MTN MTN MTN MTN LWN LWN LWN LWN HWN HWN HWN SAN SAN SAN FRR FRR FRR SAN

Don’t just take our word for it, see what our customers say

We’re proud to build high-quality homes designed for modern living, but the real proof comes from our homeowners. Hear first-hand about their experiences by visiting our Trustpilot page, where you’ll find honest reviews from people who’ve made their move with Story Homes.

My first time dealing with Story Homes and had the pleasure of meeting Brooke, one of the Sales Executives. From the moment I arrived, she was friendly, professional, and...
Daryl Meade February 26, 2026
Very welcoming, professional and friendly with detailed answers to all our questions. The show homes were also presented to a very high standard.
J R February 25, 2026
Recently needed some help with missing paperwork and I can’t fault the help I received from Michael. He went out of his way to resolve my issue I really appreciated everything he...
Vickie Wood February 25, 2026
Having now been in my new home for a few months, I can honestly say the experience has been a very positive one from start to finish.
Miss Walker February 24, 2026
We recently visited Scotby Grove and Amanda was brilliant! She was so helpful in guiding us through and helping us find potential plots.
Georgia February 23, 2026
Fiona was exceptional. All enquiries were detailed explained.
Mrs D Okediji February 23, 2026
Fiona Ure at Dumfries Summerpark couldn’t have been more helpful. Extremely knowledgeable, kind and friendly to put customers at ease and ensuring all information is given.
Janey February 21, 2026
Excellent service at Robinson Fields especially the lovely Brooke. Beautiful houses
Karen Smith February 21, 2026
From start to finish, Fiona, Zara, Jamie and Sam at Story Summerpark made our new home experience seamless and enjoyable.
Ruth Peacock February 21, 2026
We visited Scotby Grove, Carlisle today to discuss potential plots at this development. Amanda was extremely informative and very friendly.
J Wilson February 20, 2026
We can help with your move

We can help with your move

Whether you are looking to buy your first home, move home or invest, Story Homes has a range of incentives that can be structured to meet your individual requirements.

Find out more

News

Story Homes celebrates hat-trick of wins at UK Property Awards

Story Homes celebrates hat-trick of wins at UK Property Awards

Read article
Life at Longton Grange: Jonny & Emily’s story in their Hewson home

Life at Longton Grange: Jonny & Emily’s story in their Hewson home

Read article
Seasonal colour theory: adding colour into your home

Seasonal colour theory: adding colour into your home

Read article
A guide to The Middleton

A guide to The Middleton

Read article
Story Homes delivers lessons in site safety for Longton Primary School students

Story Homes delivers lessons in site safety for Longton Primary School students

Read article
We can help with your move

We can help with your move

Whether you are looking to buy your first home, move home or invest, Story Homes has a range of incentives that can be structured to meet your individual requirements.

Follow us online

Please note CGIs and photography are for illustrative purposes only; external finishes such as roof tile colours, brick, stone, render and landscaping vary between plots. Properties may also be built ‘handed’ (mirror image) of those illustrated. Dimensions are for guidance only and all measurements and areas may vary during construction. Dimensions are not intended to be used for carpet sizes, appliance space or items of furniture. Bathroom, kitchen and furniture layouts are indicative only and do not form any part of your contract. EPC ratings are based on the house type rather than the individual plot and ratings can vary between plots. Please speak to a member of the sales team for plot specific information. Any information that is available regarding future development or phases will be provided by our Sales Executive in advance of reservation.

Longton Grange has now sold out

Don't worry if you missed out, visit our nearest development at Woodbridge Green, Lea.